All cross braces had to be custom made to fit between outside beam and the main beam. All the bolts that held on the 4×6 wood beams had to be replaced. Most of the bolts had rusted off on the outside beams.

Finishing touches .


Final product.
Some other things need to be done before dismantle of the bridge. Then off to the site to be assembled again.
Todays workers
Dave S. , Larry S. ,Jerry V. ,Randy V. and Travis B. for getting magnetic drill to us. This drill made the job a lot easier.
Thank You