Starting the assembly of the 40 foot Bridge

All cross braces had to be custom made to fit between outside beam and the main beam. All the bolts that held on the 4×6 wood beams had to be replaced. Most of the bolts had rusted off on the outside beams.

Finishing touches .

Final product.

Some other things need to be done before dismantle of the bridge. Then off to the site to be assembled again.

Todays workers

Dave S. , Larry S. ,Jerry V. ,Randy V. and Travis B. for getting magnetic drill to us. This drill made the job a lot easier.

Thank You